You are here: Home / Off Reservation Gaming / Applications in Process / Enterprise Rancheria of Maidu Indians / MARCH 20, 2021: DRAFT - FIRE MOUNTAIN CASINO MUSIC VENUE PROJECT

MARCH 20, 2021: DRAFT - FIRE MOUNTAIN CASINO MUSIC VENUE PROJECT

https://files.ceqanet.opr.ca.gov/266626-3/attachment/JMetQKMUqIPfGt3JVksLT5nMNe FZJRUDkcPV0EHhiep3WZDijzPqL1vDYIlKuKg6MAo MNmp2yP6xqq_g0
When Dec 22, 2020 01:20 PM to
Mar 20, 2021 01:20 PM
Add event to calendar vCal
iCal

https://files.ceqanet.opr.ca.gov/266626-3/attachment/JMetQKMUqIPfGt3JVksLT5nMNeFZJRUDkcPV0EHhiep3WZDijzPqL1vDYIlKuKg6MAoMNmp2yP6xqq_g0


SUMMARY DESCRIPTION OF THE PROPOSED PROJECT
The Estom Yumeka Maidu Tribe of the Enterprise Rancheria (Tribe) proposes to expand its Hard Rock
Hotel and Casino Sacramento at Fire Mountain (Resort). The Fire Mountain Casino Music Venue Project
(Proposed Project) consists of the following major elements:
 Hard Rock LIVE!: The Proposed Project would include the construction of an live music venue
consisting of up to approximately 75,000 square feet (sf); and
 Back of House (BOH): To meet the Resort’s existing and anticipated needs, as well as to improve
the efficiency and operations of support facilities, the Proposed Project includes approximately
20,000 sf of BOH space. This spaces constitutes expanded offices and warehouse facilities.
A conceptual site plan for the Proposed Project is provided as Figure 2-1. Regional access to the Project
Site is provided by California State Route 65 and California State Route 70, which connect Interstate 5,
CA State Route 99, and Interstate 80 to the vicinity. The Project Site is accessible via existing driveways
on Forty Mile Rd.
Potable water is currently supplied to the Resort via one well located on land owned by the Tribe. The
Proposed Project would continue to rely on groundwater as the source of potable water. The Proposed
Project would continue to treat wastewater at the existing on-reservation wastewater treatment plant
and use existing disposal options that entail recycling via toilet and urinal flushing and landscape
irrigation, with off-site storage for excess treated wastewater.

 

Document Actions