You are here: Home / Off Reservation Gaming / Applications in Process / Pinoleville Rancheria / June 30, 2010: Ackerman Bridge Report - Flood Elevation Issue

June 30, 2010: Ackerman Bridge Report - Flood Elevation Issue

This is the latest Bridge Inspection Report from Caltrans. The sufficiency rating is 75 which is ok. The bridge was built in 1965.

PDF document icon Ackerman Br Rep.pdf — PDF document, 162 KB (166068 bytes)

Document Actions